www.47news.jp/14076628.html

archives

This URL has 1 public saves. The first save was Apr 3, 2026, 02:17 PM and the latest save was Apr 3, 2026, 02:17 PM.

View recent saves on this domain

Latest saved version

柏崎刈羽、来月16日営業運転 警報作動受け新日程申請|47NEWS(よんななニュース)

This is the newest public snapshot for this URL and the best place to start reviewing the page.

Apr 3, 2026, 02:17 PM

Source URL

https://www.47news.jp/14076628.html

About this page

This page reports that Tokyo Electric Power applied to the Nuclear Regulation Authority to conduct a final inspection for commercial operation of Kashiwazaki-Kariwa Nuclear Power Station Unit 6 (Niigata Prefecture) on April 16. A warning system activated on March 12 due to component damage, causing power generation to stop for about a week. After investigation, the actual cause was found to be a broken component connecting the generator to the earth, not a leakage. The component was replaced and power generation resumed on March 22.

Total saves

1

Latest save

Apr 3, 2026, 02:17 PM

First save

Apr 3, 2026, 02:17 PM

Saved versions

www.47news.jp/14076628.html web archives are listed here. You can still review the saved screenshot and HTML even if the original page disappears.