柏崎刈羽、来月16日営業運転 警報作動受け新日程申請|47NEWS(よんななニュース)
https://www.47news.jp/14076628.htmlBundle the HTML, screenshot, summaries, and metadata into one ZIP file.
柏崎刈羽、来月16日営業運転 警報作動受け新日程申請|47NEWS(よんななニュース)
Open the dedicated viewer to inspect the saved page with archive metadata pinned above it, similar to archive wrappers such as Web Gyotaku.
This is a self-contained HTML copy with CSS and images embedded, so it still renders even if the original page disappears.
The dedicated viewer keeps the original URL and saved timestamp visible while you review the archived HTML.
This page reports that Tokyo Electric Power applied to the Nuclear Regulation Authority to conduct a final inspection for commercial operation of Kashiwazaki-Kariwa Nuclear Power Station Unit 6 (Niigata Prefecture) on April 16. A warning system activated on March 12 due to component damage, causing power generation to stop for about a week. After investigation, the actual cause was found to be a broken component connecting the generator to the earth, not a leakage. The component was replaced and power generation resumed on March 22.
