Archive readyExternal timestamp ready

あおみ・道南綜合・濱谷 経常建設共同企業体 - 国土交通省 ネガティブ情報等検索サイト

https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=shimeiteishi&EID=search&no=29
May 4, 2026 at 03:30 AM JSTThe archive page, viewer, and downloads use this saved version.
May 4, 2026 at 03:30 AM JST·www.mlit.go.jp

The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.

External timestamp

The evidence pack includes the third-party timestamp files.

External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
May 5, 2026 at 03:30 AM JST

Pages linking to this archive

These partner pages link back to this preserved source so the original record stays traceable.

Saved page

あおみ・道南綜合・濱谷 経常建設共同企業体 - 国土交通省 ネガティブ情報等検索サイト

Open the archived HTML with saved-time metadata attached.

This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.

About this pageAI generated

このページは、あおみ・道南綜合・濱谷経常建設共同企業体に関する指名停止措置についての情報を提供しています。措置は2025年3月11日に北海道開発局によって行われ、理由は港則法違反による罰金刑で、該当する工事は「釧路港土砂処分場護岸C部建設工事」とされています。指名停止の期間は令和7年3月11日から4月10日までです。