Archive readyExternal timestamp ready

いえの和 - 国土交通省 ネガティブ情報等検索サイト

https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=684
May 9, 2026 at 03:30 PM JSTThe archive page, viewer, and downloads use this saved version.
May 9, 2026 at 03:30 PM JST·www.mlit.go.jp

The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.

External timestamp

The evidence pack includes the third-party timestamp files.

External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
May 10, 2026 at 03:27 PM JST

Pages linking to this archive

These partner pages link back to this preserved source so the original record stays traceable.

Saved page

いえの和 - 国土交通省 ネガティブ情報等検索サイト

Open the archived HTML with saved-time metadata attached.

This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.

About this pageAI generated

このページは、建設業者「いえの和」に関するネガティブ情報を提供しています。法人番号や代表者名、所在地、許可番号などの基本情報が記載されており、2022年3月29日に和歌山県より行政処分を受けたことが報告されています。処分の原因は、作業現場での労働者の安全管理に関する違反であり、高垣和弘代表が監督する工事現場で、労働者が墜落の危険がある状況で作業を行わせた結果、大けがを負わせたことが挙げられています。さらに、営業所の技術者としての適格性も疑問視されたことから、建設業法に基づく違反となっています。

いえの和 - 国土交通省 ネガティブ情報等検索サイト - Saved screenshot

The full page can be captured up to 15,000px in height so you can review the complete page layout when needed.