Archive readyExternal timestamp ready
株式会社楠田建設 - 国土交通省 ネガティブ情報等検索サイト
https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1594June 6, 2026 at 03:30 AM JST•The archive page, viewer, and downloads use this saved version.
June 6, 2026 at 03:30 AM JST·www.mlit.go.jp
The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.
External timestamp
The evidence pack includes the third-party timestamp files.
External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
June 7, 2026 at 12:15 AM JST
Pages linking to this archive
These partner pages link back to this preserved source so the original record stays traceable.
Saved page
株式会社楠田建設 - 国土交通省 ネガティブ情報等検索サイト
Open the archived HTML with saved-time metadata attached.
Original URLhttps://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1594
StartedJune 6, 2026 at 03:30 AM JST
This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.
About this pageAI generated
このページは、株式会社楠田建設に関するネガティブ情報を提供する国土交通省のサイトです。同社は兵庫県に所在し、建設業の許可を受けていますが、労働安全衛生法違反により罰金を科せられ、建設業法に基づく処分が下されました。事故は2023年4月17日に発生し、具体的には罰金30万円が姫路簡易裁判所で確定しました。このような情報は公共の利用者向けに公開されています。
