20260108_695f2f1f64da5_upfile
https://www.cbr.mlit.go.jp/kisya_manage/app/press/file/20260108_e9beb06f3aeba11f4a34f36111dde854/20260108_695f2f1f64da5_upfile.pdfThe evidence pack includes the preserved original, metadata, hashes, and available timestamp verification files. It can be downloaded on Pro.
Pages linking to this archive
These partner pages link back to this preserved source so the original record stays traceable.
20260108_695f2f1f64da5_upfile
一級建築士に関する公告
/kensei/sumai_topics/topics17.htm
Open save20241028_671f0e80be93b_upfile
/kisya_manage/app/press/file/20241028_4add3e166422d39c007bf7c624110c0d/20241028_671f0e80be93b_upfile.pdf
Open save中部地方整備局による鹿島建設の指名停止措置
/kisya_manage/app/press/file/20250122_d1b496b8256a80fbdfad8b39a4d2b4e4/20250122_6790376c2709f_upfile.pdf
This document outlines the suspension measures against Kajima Corporation due to inadequate safety management that led to an accident involving construction personnel. The suspension will be in effect for six weeks, from January 22 to March 4, 2023, within the jurisdiction of the Chubu Regional Development Bureau. The reason for the suspension is linked to an accident that occurred on October 14, 2024, during the construction of a tunnel, where a worker was injured due to falling rocks. The document details the circumstances of the accident and the basis for the suspension measures.
Open save20250411_67f86bda89d5e_upfile
/kisya_manage/app/press/file/20250411_3b989d9756c402ea3dd2297449388e08/20250411_67f86bda89d5e_upfile.pdf
Open save20250411_67f86b71568f0_upfile
/kisya_manage/app/press/file/20250411_8b186b75cea42a8b95220478ed2aafc9/20250411_67f86b71568f0_upfile.pdf
Open save20250619_68535a7ec3387_upfile
/kisya_manage/app/press/file/20250619_749c670d049d0cdeec7bdc42c38b7da8/20250619_68535a7ec3387_upfile.pdf
Open save