Archive ready

https://www.thr.mlit.go.jp/bumon/kisya/kisyah/images/102849_1.pdf

https://www.thr.mlit.go.jp/bumon/kisya/kisyah/images/102849_1.pdf
July 13, 2026 at 10:33 AM JSTThe archive page, viewer, and downloads use this saved version.
July 13, 2026 at 10:33 AM JST·www.thr.mlit.go.jp

The evidence pack includes the preserved original, metadata, hashes, and available timestamp verification files. It can be downloaded on Pro.

Pages linking to this archive

These partner pages link back to this preserved source so the original record stays traceable.

Saved PDF

https://www.thr.mlit.go.jp/bumon/kisya/kisyah/images/102849_1.pdf

StartedJuly 13, 2026 at 10:33 AM JST
File size0.12 MB
SHA-256bdcb8ee16cae9948ba9017ee18436c72139820027228dcc99dade0c6f7cfaaa9

Recent saves on this domain

Other recently saved pages from the same source domain.

7/13/2026

建築関連業務 | 国土交通省 東北地方整備局 建政部

/bumon/b06111/kenseibup/seibi/gyosei/gyosei06/index.html

Open save
7/13/2026

https://www.thr.mlit.go.jp/bumon/kisya/kisyah/images/102850_1.pdf

/bumon/kisya/kisyah/images/102850_1.pdf

Open save
7/13/2026

指名停止措置業者名及び住所(令和7年7月23日)

/Bumon/kisya/kisyah/images/104029_1.pdf

This document outlines the suspension of designation measures announced by the Tohoku Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism. It indicates that Sasaki Corporation was deemed unsuitable as a contractor due to fraudulent or dishonest conduct. The suspension lasts for three months, following the cancellation of their bid for a construction contract. The document includes details about the suspension measures, reasons, and contact information, along with information for the press release.

Open save
7/13/2026

https://www.thr.mlit.go.jp/Bumon/kisya/kisyah/images/105787_1.pdf

/Bumon/kisya/kisyah/images/105787_1.pdf

Open save
7/13/2026

指名停止措置業者名及び住所に関する通知

/Bumon/kisya/kisyah/images/106584_1.pdf

This document provides information regarding the suspension of designation measures issued by the Tohoku Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism. It specifically addresses the case of Sato Construction Co., Ltd., which faced suspension due to a fatal accident involving a worker during construction work. The suspension period is set for two weeks starting from March 25, 2026. The document outlines the reasons for the suspension, the scope of the measures, and includes details about the incident, as well as contact information for relevant officials. It serves as an official notification regarding the enforcement of safety management protocols in construction projects.

Open save
7/13/2026

http://www.thr.mlit.go.jp/Bumon/kisya/kisyah/images/95619_1.pdf

/Bumon/kisya/kisyah/images/95619_1.pdf

Open save