Archive readyExternal timestamp ready

測量業者に対する監督処分について

https://www.thr.mlit.go.jp/Bumon/kisya/kisyah/images/105025_1.pdf
July 13, 2026 at 10:05 AM JSTThe archive page, viewer, and downloads use this saved version.
July 13, 2026 at 10:05 AM JST·www.thr.mlit.go.jp

The evidence pack includes the preserved original, metadata, hashes, and available timestamp verification files. It can be downloaded on Pro.

External timestamp

The evidence pack includes the third-party timestamp files.

External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
July 13, 2026 at 11:46 AM JST
Saved PDF

測量業者に対する監督処分について

StartedJuly 13, 2026 at 10:05 AM JST
File size0.07 MB
SHA-25643cb7d029edc533259fd104d94a7a6f2a1d83b9f1816e0ca8f5b59364aa1b94b
About this pageAI generated

This document is a press release from the Tohoku Regional Development Bureau dated September 16, 2023, regarding the supervisory action taken against Meiko Giken Co., Ltd. The company has been subjected to a suspension of operations based on the Surveying Act due to its former representative's involvement in illegal activities related to bidding, resulting in a conviction for bribery. The suspension will last for six months, from October 1, 2023, to March 31, 2024, affecting all surveying operations nationwide.

Recent saves on this domain

Other recently saved pages from the same source domain.

7/13/2026

建築関連業務 | 国土交通省 東北地方整備局 建政部

/bumon/b06111/kenseibup/seibi/gyosei/gyosei06/index.html

Open save
7/13/2026

https://www.thr.mlit.go.jp/bumon/kisya/kisyah/images/102850_1.pdf

/bumon/kisya/kisyah/images/102850_1.pdf

Open save
7/13/2026

https://www.thr.mlit.go.jp/bumon/kisya/kisyah/images/102849_1.pdf

/bumon/kisya/kisyah/images/102849_1.pdf

Open save
7/13/2026

指名停止措置業者名及び住所(令和7年7月23日)

/Bumon/kisya/kisyah/images/104029_1.pdf

This document outlines the suspension of designation measures announced by the Tohoku Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism. It indicates that Sasaki Corporation was deemed unsuitable as a contractor due to fraudulent or dishonest conduct. The suspension lasts for three months, following the cancellation of their bid for a construction contract. The document includes details about the suspension measures, reasons, and contact information, along with information for the press release.

Open save
7/13/2026

https://www.thr.mlit.go.jp/Bumon/kisya/kisyah/images/105787_1.pdf

/Bumon/kisya/kisyah/images/105787_1.pdf

Open save
7/13/2026

指名停止措置業者名及び住所に関する通知

/Bumon/kisya/kisyah/images/106584_1.pdf

This document provides information regarding the suspension of designation measures issued by the Tohoku Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism. It specifically addresses the case of Sato Construction Co., Ltd., which faced suspension due to a fatal accident involving a worker during construction work. The suspension period is set for two weeks starting from March 25, 2026. The document outlines the reasons for the suspension, the scope of the measures, and includes details about the incident, as well as contact information for relevant officials. It serves as an official notification regarding the enforcement of safety management protocols in construction projects.

Open save