ZEB・環境配慮型のCM事例|明豊FWのコンストラクション・マネジメント
https://www.meiho.co.jp/service/zeb/The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.
External timestamp
The evidence pack includes the third-party timestamp files.
ZEB・環境配慮型のCM事例|明豊FWのコンストラクション・マネジメント
Open the archived HTML with saved-time metadata attached.
This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.
This page introduces Net Zero Energy Building (ZEB) and environmentally conscious construction projects managed by Meiho Facility Works. Following the Paris Agreement, reducing energy consumption has become crucial. The page explains ZEB's four classifications and presents the Chiba Shoka University High School construction project as a case study. This project aims to realize Japan's first ZEB high school, featuring approximately 10,000 square meters of floor space with reinforced concrete structure. Meiho FW supported the entire process including basic planning, designer/contractor selection, and construction management. The project emphasizes renewable energy implementation while maintaining cost-effectiveness and educational environment quality.
