Archive ready

20251006_68e30fe584771_upfile

https://www.cbr.mlit.go.jp/kisya_manage/app/press/file/20251006_2b0dd11d418ab1730df71d6cb5e827fe/20251006_68e30fe584771_upfile.pdf
July 13, 2026 at 10:32 AM JSTThe archive page, viewer, and downloads use this saved version.
July 13, 2026 at 10:32 AM JST·www.cbr.mlit.go.jp

The evidence pack includes the preserved original, metadata, hashes, and available timestamp verification files. It can be downloaded on Pro.

Pages linking to this archive

These partner pages link back to this preserved source so the original record stays traceable.

Saved PDF

20251006_68e30fe584771_upfile

StartedJuly 13, 2026 at 10:32 AM JST
File size0.14 MB
SHA-25651af6618d0c1a88206bbfccf19c6fe91237b11c5f1cf5a61532c5caf071adf35

Recent saves on this domain

Other recently saved pages from the same source domain.

7/13/2026

一級建築士の懲戒処分について(中部地方整備局)

/kisya_manage/app/press/file/20260108_e9beb06f3aeba11f4a34f36111dde854/20260108_695f2f1f64da5_upfile.pdf

This document is a notification from the Chubu Regional Development Bureau regarding disciplinary actions taken against two first-class architects. On January 6, 2023, both architects received reprimands for violations related to building standards and fire safety regulations in their designs for buildings located in Aichi and Mie Prefectures. The violations included failing to meet necessary standards for buildings exceeding 300 square meters and neglecting to install automatic fire alarm systems in fire-prone structures. The document outlines the specifics of these infractions and the resulting disciplinary measures.

Open save
7/13/2026

一級建築士に関する公告

/kensei/sumai_topics/topics17.htm

Open save
7/13/2026

20241028_671f0e80be93b_upfile

/kisya_manage/app/press/file/20241028_4add3e166422d39c007bf7c624110c0d/20241028_671f0e80be93b_upfile.pdf

Open save
7/13/2026

中部地方整備局による鹿島建設の指名停止措置

/kisya_manage/app/press/file/20250122_d1b496b8256a80fbdfad8b39a4d2b4e4/20250122_6790376c2709f_upfile.pdf

This document outlines the suspension measures against Kajima Corporation due to inadequate safety management that led to an accident involving construction personnel. The suspension will be in effect for six weeks, from January 22 to March 4, 2023, within the jurisdiction of the Chubu Regional Development Bureau. The reason for the suspension is linked to an accident that occurred on October 14, 2024, during the construction of a tunnel, where a worker was injured due to falling rocks. The document details the circumstances of the accident and the basis for the suspension measures.

Open save
7/13/2026

20250411_67f86bda89d5e_upfile

/kisya_manage/app/press/file/20250411_3b989d9756c402ea3dd2297449388e08/20250411_67f86bda89d5e_upfile.pdf

Open save
7/13/2026

20250411_67f86b71568f0_upfile

/kisya_manage/app/press/file/20250411_8b186b75cea42a8b95220478ed2aafc9/20250411_67f86b71568f0_upfile.pdf

Open save