Archive readyExternal timestamp ready
安本組 - 国土交通省 ネガティブ情報等検索サイト
https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1378June 6, 2026 at 03:31 PM JST•The archive page, viewer, and downloads use this saved version.
June 6, 2026 at 03:31 PM JST·www.mlit.go.jp
The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.
External timestamp
The evidence pack includes the third-party timestamp files.
External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
June 7, 2026 at 08:00 AM JST
Pages linking to this archive
These partner pages link back to this preserved source so the original record stays traceable.
Saved page
安本組 - 国土交通省 ネガティブ情報等検索サイト
Open the archived HTML with saved-time metadata attached.
Original URLhttps://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1378
StartedJune 6, 2026 at 03:31 PM JST
This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.
About this pageAI generated
このページは、建設業者である安本組に関するネガティブ情報を提供しています。代表者は安本宏樹で、大阪府岸和田市に主たる営業所を構えています。2024年11月15日に大阪府から営業停止処分を受け、営業停止期間は令和6年11月29日から同年12月10日までの12日間です。この処分は、同業者から許可を得ずに高額な建設工事を請け負ったことが原因とされています。安本組は、その後許可を取得しています。
