Archive readyExternal timestamp ready
山本住宅建設 - 国土交通省 ネガティブ情報等検索サイト
https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=679May 9, 2026 at 09:30 AM JST•The archive page, viewer, and downloads use this saved version.
May 9, 2026 at 09:30 AM JST·www.mlit.go.jp
The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.
External timestamp
The evidence pack includes the third-party timestamp files.
External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
May 10, 2026 at 09:32 AM JST
Pages linking to this archive
These partner pages link back to this preserved source so the original record stays traceable.
Saved page
山本住宅建設 - 国土交通省 ネガティブ情報等検索サイト
Open the archived HTML with saved-time metadata attached.
Original URLhttps://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=679
StartedMay 9, 2026 at 09:30 AM JST
This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.
About this pageAI generated
このページは、山本住宅建設に関するネガティブ情報を提供しています。長崎県諫早市の同社は、労働安全衛生法に違反し、労働者に危険を及ぼす作業を行わせた結果、重篤な怪我を負わせたことがあり、2022年3月28日に長崎県から指示処分を受けています。この処分は、再発防止のための措置を講じることや、実施した措置を文書で報告することを求める内容です。また、同社の実質代表者は罰金20万円の略式命令を受けており、この事案は建設業法第28条第1項に基づく監督処分の対象となっています。
