Archive readyExternal timestamp ready

株式会社坂林盛樹園 - 国土交通省 ネガティブ情報等検索サイト

https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1602
June 6, 2026 at 09:30 PM JSTThe archive page, viewer, and downloads use this saved version.
June 6, 2026 at 09:30 PM JST·www.mlit.go.jp

The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.

External timestamp

The evidence pack includes the third-party timestamp files.

External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
June 7, 2026 at 11:15 AM JST

Pages linking to this archive

These partner pages link back to this preserved source so the original record stays traceable.

Saved page

株式会社坂林盛樹園 - 国土交通省 ネガティブ情報等検索サイト

Open the archived HTML with saved-time metadata attached.

This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.

About this pageAI generated

このページは、株式会社坂林盛樹園に関するネガティブ情報を提供しています。同社は兵庫県三田市に所在し、土木工事や舗装工事などの建設業を営んでいます。2024年10月16日、同社は建設業法第28条第1項に基づき、業務指示を受けました。その原因は、「ラ・ビスタ宝塚レフィナス改修工事」に関して、必要な書面を作成しなかったことです。これにより、違反が成立しました。

株式会社坂林盛樹園 - 国土交通省 ネガティブ情報等検索サイト - Saved screenshot

The full page can be captured up to 15,000px in height so you can review the complete page layout when needed.