Archive ready

経産省が中部電を指導 工事費の未精算問題|47NEWS(よんななニュース)

https://www.47news.jp/14117529.html
April 7, 2026 at 08:01 PM JSTThe archive page, viewer, and downloads use this saved version.
April 7, 2026 at 08:01 PM JST·www.47news.jp

The evidence pack includes the HTML, screenshot, summary, and metadata in one ZIP file. For signed-in saves, Kiroku also starts the external RFC 3161 timestamp flow automatically. Downloading the evidence pack is available on Pro. If any asset is still missing, Kiroku prepares it before the download starts.

Saved page

経産省が中部電を指導 工事費の未精算問題|47NEWS(よんななニュース)

Open the dedicated viewer to inspect the saved page with archive metadata pinned above it.

StartedApril 7, 2026 at 08:01 PM JST

This is a self-contained HTML copy with CSS and images embedded, so it still renders even if the original page disappears.

The dedicated viewer keeps the original URL and saved timestamp visible while you review the archived HTML.

About this pageAI generated

This page reports that Japan's Ministry of Economy, Trade and Industry instructed Chubu Electric Power to strengthen measures preventing recurrence of its failure to complete settlement procedures for safety improvement work at Hamaoka Nuclear Power Plant in Shizuoka Prefecture. The issue was discovered in November last year. METI issued reporting orders based on the Electricity Business Law in November last year and January this year. Chubu Electric Power submitted a report at the end of March.

経産省が中部電を指導 工事費の未精算問題|47NEWS(よんななニュース) - Saved screenshot

The full page can be captured up to 15,000px in height so you can review the complete page layout when needed.