Archive ready

報道発表資料:国道470号 能越自動車道 通行止め解除の当面の見通しについて - 国土交通省

https://www.mlit.go.jp/report/press/road01_hh_001750.html
April 8, 2026 at 03:06 AM JSTThe archive page, viewer, and downloads use this saved version.
April 8, 2026 at 03:06 AM JST·www.mlit.go.jp

Bundle the HTML, screenshot, summaries, and metadata into one ZIP file. The first export request adds an external RFC 3161 timestamp before download.

Saved page

報道発表資料:国道470号 能越自動車道 通行止め解除の当面の見通しについて - 国土交通省

Open the dedicated viewer to inspect the saved page with archive metadata pinned above it.

StartedApril 8, 2026 at 03:06 AM JST

This is a self-contained HTML copy with CSS and images embedded, so it still renders even if the original page disappears.

The dedicated viewer keeps the original URL and saved timestamp visible while you review the archived HTML.

About this pageAI generated

This page announces the expected timeline for reopening National Route 470 Noe-Etsu Expressway, closed due to damage from the 2024 Noto Peninsula earthquake. The section from Noto Mii IC to Noto Satoyama Airport IC (4.7km) is now open to general traffic in one direction toward Anamizu. The section from Noto Satoyama Airport IC to Anamizu IC (6.2km) is expected to reopen by early February as one-way traffic toward Wajima. Delays may occur due to aftershocks and weather conditions.

報道発表資料:国道470号 能越自動車道 通行止め解除の当面の見通しについて - 国土交通省 - Saved screenshot

The full page can be captured up to 15,000px in height so you can review the complete page layout when needed.