Archive ready

【速報】東電福島第2原発のプール冷却再開|47NEWS(よんななニュース)

https://www.47news.jp/14113828.html
April 7, 2026 at 02:01 AM JSTThe archive page, viewer, and downloads use this saved version.
April 7, 2026 at 02:01 AM JST·www.47news.jp

Bundle the HTML, screenshot, summaries, and metadata into one ZIP file. The first export request adds an external RFC 3161 timestamp before download.

Saved page

【速報】東電福島第2原発のプール冷却再開|47NEWS(よんななニュース)

Open the dedicated viewer to inspect the saved page with archive metadata pinned above it.

StartedApril 7, 2026 at 02:01 AM JST

This is a self-contained HTML copy with CSS and images embedded, so it still renders even if the original page disappears.

The dedicated viewer keeps the original URL and saved timestamp visible while you review the archived HTML.

About this pageAI generated

This page reports that Tokyo Electric Power Company has resumed cooling of the spent fuel pool at Fukushima Daiichi Nuclear Power Station Unit 1. The cooling had been temporarily halted due to an alarm, but after restoration work, the company confirmed normal operation and restarted the cooling system. There is no impact on the external environment.

【速報】東電福島第2原発のプール冷却再開|47NEWS(よんななニュース) - Saved screenshot

The full page can be captured up to 15,000px in height so you can review the complete page layout when needed.