Archive ready

リニア静岡早期着工を 国交相、JR東海に要請|47NEWS(よんななニュース)

https://www.47news.jp/14068356.html
April 4, 2026 at 06:17 AM JSTThe archive page, viewer, and downloads use this saved version.
April 4, 2026 at 06:17 AM JST·www.47news.jp

Bundle the HTML, screenshot, summaries, and metadata into one ZIP file.

Saved page

リニア静岡早期着工を 国交相、JR東海に要請|47NEWS(よんななニュース)

Open the dedicated viewer to inspect the saved page with archive metadata pinned above it, similar to archive wrappers such as Web Gyotaku.

StartedApril 4, 2026 at 06:17 AM JST

This is a self-contained HTML copy with CSS and images embedded, so it still renders even if the original page disappears.

The dedicated viewer keeps the original URL and saved timestamp visible while you review the archived HTML.

About this pageAI generated

This page reports that Transport Minister Kaneko Yasuyuki requested JR Central to accelerate early construction of the Shizuoka section of the Linear Chuo Shinkansen. On March 28, 2026, Kaneko visited experimental facilities in Yamanashi and a station construction site in Sagamihara, requesting disclosure of the opening schedule for the Tokyo-Nagoya route and project progress updates. JR Central President Niwa emphasized providing careful explanations to local residents but refrained from discussing the opening timeline, citing the pending start of the Shizuoka section. On March 26, Shizuoka's expert panel approved JR Central's response to 28 issues raised by the prefecture.

リニア静岡早期着工を 国交相、JR東海に要請|47NEWS(よんななニュース) - Saved screenshot

The full page can be captured up to 15,000px in height so you can review the complete page layout when needed.