使用済み核燃料プール、冷却再開 福島第2原発1号機、復旧|47NEWS(よんななニュース)
https://www.47news.jp/14113831.htmlBundle the HTML, screenshot, summaries, and metadata into one ZIP file. The first export request adds an external RFC 3161 timestamp before download.
使用済み核燃料プール、冷却再開 福島第2原発1号機、復旧|47NEWS(よんななニュース)
Open the dedicated viewer to inspect the saved page with archive metadata pinned above it.
This is a self-contained HTML copy with CSS and images embedded, so it still renders even if the original page disappears.
The dedicated viewer keeps the original URL and saved timestamp visible while you review the archived HTML.
This page reports that Tokyo Electric Power Company resumed cooling of the spent fuel pool at Fukushima Daini Nuclear Power Station Unit 1. An alarm sounded on the 5th due to smoke, prompting cooling to be suspended. After completing restoration work on the 6th and confirming no operational abnormalities, cooling was resumed at approximately 11 PM. The pool contains 2,334 spent fuel assemblies and 200 new fuel assemblies. The pool temperature at resumption was 32.5 degrees, below the regulatory limit of 65 degrees. No radioactive material leakage to the environment was reported.
