Archive ready

使用済み核燃料プール、冷却再開 福島第2原発1号機、復旧|47NEWS(よんななニュース)

https://www.47news.jp/14113831.html
April 7, 2026 at 04:01 AM JSTThe archive page, viewer, and downloads use this saved version.
April 7, 2026 at 04:01 AM JST·www.47news.jp

Bundle the HTML, screenshot, summaries, and metadata into one ZIP file. The first export request adds an external RFC 3161 timestamp before download.

Saved page

使用済み核燃料プール、冷却再開 福島第2原発1号機、復旧|47NEWS(よんななニュース)

Open the dedicated viewer to inspect the saved page with archive metadata pinned above it.

StartedApril 7, 2026 at 04:01 AM JST

This is a self-contained HTML copy with CSS and images embedded, so it still renders even if the original page disappears.

The dedicated viewer keeps the original URL and saved timestamp visible while you review the archived HTML.

About this pageAI generated

This page reports that Tokyo Electric Power Company resumed cooling of the spent fuel pool at Fukushima Daini Nuclear Power Station Unit 1. An alarm sounded on the 5th due to smoke, prompting cooling to be suspended. After completing restoration work on the 6th and confirming no operational abnormalities, cooling was resumed at approximately 11 PM. The pool contains 2,334 spent fuel assemblies and 200 new fuel assemblies. The pool temperature at resumption was 32.5 degrees, below the regulatory limit of 65 degrees. No radioactive material leakage to the environment was reported.

使用済み核燃料プール、冷却再開 福島第2原発1号機、復旧|47NEWS(よんななニュース) - Saved screenshot

The full page can be captured up to 15,000px in height so you can review the complete page layout when needed.