Archive readyExternal timestamp ready
旭化成建材(株)による杭工事実績3,040件に関する調査報告 | 2015年度 | ニュース | 旭化成株式会社
https://www.asahi-kasei.com/jp/news/2015/ze151124.htmlMay 4, 2026 at 09:17 AM JST•The archive page, viewer, and downloads use this saved version.
May 4, 2026 at 09:17 AM JST·www.asahi-kasei.com
The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.
External timestamp
The evidence pack includes the third-party timestamp files.
External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
May 5, 2026 at 09:15 AM JST
Pages linking to this archive
These partner pages link back to this preserved source so the original record stays traceable.
Saved page
旭化成建材(株)による杭工事実績3,040件に関する調査報告 | 2015年度 | ニュース | 旭化成株式会社
Open the archived HTML with saved-time metadata attached.
StartedMay 4, 2026 at 09:17 AM JST
This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.
About this pageAI generated
このページは、旭化成建材株式会社の杭工事に関する調査報告についての内容です。2015年11月24日に発表されたこの報告では、施工データの流用が疑われる3,040件の調査が完了し、360件でデータの流用等が確認されたことが述べられています。調査結果を国土交通省へ報告し、一部報告の不備も認めています。旭化成建材は、今後は適切な是正策を講じるための社内調査を進め、年内に中間報告を行う予定です。また、安全性確認に協力する意向も示されており、関係者に対して深いお詫びがなされています。
