Archive readyExternal timestamp ready
菅原組 - 国土交通省 ネガティブ情報等検索サイト
https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1376June 8, 2026 at 09:31 PM JST•The archive page, viewer, and downloads use this saved version.
June 8, 2026 at 09:31 PM JST·www.mlit.go.jp
The evidence pack includes HTML, screenshots, summaries, and metadata. It can be downloaded on Pro.
External timestamp
The evidence pack includes the third-party timestamp files.
External timestamp
External timestamp ready
Provider
DigiCert RFC3161
TSA time
June 9, 2026 at 03:00 PM JST
Pages linking to this archive
These partner pages link back to this preserved source so the original record stays traceable.
Saved page
菅原組 - 国土交通省 ネガティブ情報等検索サイト
Open the archived HTML with saved-time metadata attached.
Original URLhttps://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1376
StartedJune 8, 2026 at 09:31 PM JST
This HTML has CSS and images embedded, so it can still be opened even if the original page disappears.
About this pageAI generated
このページは、菅原組に関するネガティブ情報を提供する国土交通省の検索サイトの内容です。菅原組は、大阪府大阪市に所在し、代表者は菅原和人です。2024年11月19日に大阪府から営業停止処分を受けており、営業停止期間は令和6年11月29日から12月25日までの27日間です。この処分は、建設業法第28条第3項に基づくもので、民間発注工事において許可を受けずに一定金額以上の工事を請け負ったことが原因とされています。
